About Linked Models
ElumTools will operate with linked models in the typical Revit Architecture/MEP relationship using the following rules:
-
The luminaires, calculation points, and rooms/spaces used in the calculation must be in the host model (this is the typical Revit MEP use case).
-
The materials in the linked models need to be mapped using the ElumTools Material Mapping command to match those in the Host model. See Materials Mapping.
- The "Selected Elements" option from the Calculate command series cannot detect selected elements from linked models.
-
Each Linked Model should have one or more 3D views defined. This is a requirement for Projected Calculation Points and Planar Face Calculation Points.